This project showcases technical ingenuity, where the building’s 1.08° rotation per floor demanded exceptional coordination between MEP and structural teams. With limited vertical core space, risers and fresh air systems were ingeniously routed through the rotating geometry — redefining conventional MEP execution with precision and collaboration.